Independent living units up to 1,200 sq. ft.
offering up to 1,200 sq. ft. with direct connection
Conversion ADUs: Transform Existing Spaces
Affordable 500 sq. ft. units within existing homes.
Maximum Size: Up to 1,200 sq. ft.
Height: Single-story ADUs: 16 feet; Two-story ADUs: Up to 20 feet with 5-foot setbacks.
Front Yard: Must comply with zoning regulations.
HSide and Rear Yards: Minimum 4 feet.
Rules: Parking may be required unless exemptions apply.
Exemptions: Waived if the ADU is near public transit or converts a garage/carport.
Maximum Size: Up to 1,200 sq. ft.
Height: Matches the height of the existing primary residence.
Maximum Size: Up to 1,200 sq. ft.
Height: Matches the height of the existing primary residence.
Rules: Parking is not required in most cases.
Exemptions: Applies to public transit proximity or garage conversions.
Maximum Size: Based on the size of the converted space; no strict square footage limit.
Height: Matches the existing structure’s height.
Front Yard: Must comply with zoning rules.
Side and Rear Yards: Setbacks are waived for existing structures being converted.
Parking:
Rules: Parking is not required for garage or storage conversions.
Exemptions: Conversions near public transit automatically qualify for exemptions.
Maximum Size: 500 sq. ft.
Heights: Matches the primary home’s height.
Front Yard: Zoning rules apply.
Side and Rear Yards: Exempt when converting an existing part of the home.
Rules: No additional parking is required.
Exemptions: Automatically waived when converting an attached garage.
Answer: Detached ADUs can be up to 1,200 sq. ft.
Answer: Yes, two-story ADUs are allowed, with a height limit of 20 feet and 5-foot setbacks.
Answer: Attached ADUs are capped at 1,200 sq. ft. or 50% of the primary home’s size, whichever is smaller.
Answer: Yes, side and rear yard setbacks are 4 feet. For two-story ADUs, 5- foot setbacks apply.
Answer: Yes, garage conversions are allowed, and no replacement parking is required.
Answer: Parking is waived for ADUs near public transit or if a garage is converted.
Answer: You can build 1 ADU and 1 JADU on a single-family property.
Answer: Yes, multifamily properties can add up to 2 detached ADUs and convert non-livable spaces.
Answer: JADUs are up to 500 sq. ft., created within the main home, and require an efficiency kitchen and separate entrance.
Answer: Permits are typically approved within 4–6 months.
Every project tells a story of transformation. At CRS Builders, we craft more than structures—we shape environments that inspire and elevate. Discover how homeowners across San Diego have reimagined their spaces with our expertise, creating lasting impressions and meaningful living experiences.
4885 Ronson Ct Suite J,
San Diego 92111
© 2025 CRS Builders